BELENE NPP
Energy for the future


www.belene-npp.com » Home

Home

The beginning of construction   The discussions on constructing a second nuclear power plant started in the early 1970’s. After performing the necessary investigations, studies and analys...[»]
The two units to be erected on Belene NPP Site are of A-92 design with pressurized water reactor (PWR), with 1000 MW electric power. The design features contemporary control and safety systems and has...[»]
 The stages in the implementation of Belene NPP Project are: selection of a consultant and providing financing, design, preliminary activities on site and production of long-lead equipment. &nbs...[»]


© 2005-2008 Belene NPP Construction Project | Design & Development MediaDesign | Powered by FlexiCMS™